
-
水性防腐鋼構(gòu)漆系列 Waterborne anti-corrosion steel structure paint series
-
原生態(tài)功能乳膠漆系列 Original ecological functional latex paint series
-
彈性外墻紋理質(zhì)感涂料 Elastic exterior wall texture texture coating
-
外墻高滲透封固底漆 High permeability sealing primer for exterior walls
-
內(nèi)墻藝術(shù)(彈性)質(zhì)感涂料(C3500) Interior wall art (elastic) texture coating (C3500)
環(huán)氧地坪漆
Epoxy Flooring
主要用于室內(nèi)外、混凝土及墻璧紙裝修及保護(hù)。
關(guān)鍵字:
環(huán)氧地坪漆
所屬分類 Category:
地坪漆
Floor Paint

咨詢熱線 Tel:
產(chǎn)品詳情 Description
億翔環(huán)氧地坪漆應(yīng)用在制藥、食品、醫(yī)院、紡織、化工、電子等行業(yè)的生產(chǎn)廠房、辦公樓、倉(cāng)庫(kù)、實(shí)驗(yàn)室的地坪涂裝,特別適用于一樓地面、地下室、地下停車場(chǎng)和其它較為潮濕的環(huán)境。施工簡(jiǎn)易、遮蓋力強(qiáng)、施工面積大、耐磨、抗酸堿等功能。
特點(diǎn)
●耐磨耐壓
●防酸堿
●防滑
●耐水防潮
施工方法
第1步:施工前除去基層表面松動(dòng)的灰、沙土、油污、水份以及其他附著物。
第2步:施工封閉透明底漆1-2遍,若遇新水泥地面,則要多施工一遍底漆,以防泛堿的現(xiàn)象。
第3步:等8-12小時(shí)后,待底漆干透后,再施工彩色耐磨中涂1-2遍。
第4步:等24小時(shí)后,再噴涂耐磨罩光油1-2遍,24小時(shí)后才能行人或擺放物品。行走車輛要等待48小時(shí)后方可。
第5步:施工工具要做好環(huán)保處理。
施工步驟
除塵,施工封閉透明底漆8-12小時(shí)后施工中涂,中涂1-2遍,24小時(shí)后,噴涂耐磨罩光面油。
儲(chǔ)存
●密封存于5-40℃陰涼干燥處,保質(zhì)18個(gè)月。
特別提示:
1、該漆粘附力扔強(qiáng),應(yīng)遮蓋無(wú)需上漆的部位;施工結(jié)束后立即清洗工具。
2、色漆因施工面材居不局會(huì)顯現(xiàn)出與色卡上顏色不同或明暗度不同的新色、建議將色漆取出,先做小面積小程然后確。正確顏色后,再做大面積施工。
3、貯存在兒童不易觸碰地方。涂刷面積:
理論值(底漆)6-9/平米/公斤(面漆)8-10平米/公斤,因底材材質(zhì)氣候不同,實(shí)際施工面積將與理論值有所差異。
Yixiang epoxy floor paint is used in the floor coating of production plants, office buildings, warehouses and laboratories in pharmaceutical, food, hospital, textile, chemical, electronics and other industries, especially suitable for the ground floor, basement, underground parking lot and other humid environments. Simple construction, strong hiding power, large construction area, wear resistance, acid and alkali resistance and other functions.
Feature
●Wear resistance and pressure resistance
●Acid and alkali protection
●Anti-slip
●Water and moisture resistance
Construction methods
Step 1: Remove loose ash, sand, oil, water and other adhesions from the surface of the base layer before construction.
Step 2: Apply the closed transparent primer 1-2 times, if you encounter a new cement floor, apply the primer once more to prevent the phenomenon of alkali.
Step 3: Wait 8-12 hours, wait for the primer to dry through, and then apply the color wear-resistant medium coating 1-2 times.
Step 4: Wait 24 hours before spraying the wear mask varnish 1-2 times, and only after 24 hours can pedestrians or place objects. Vehicles must wait 48 hours before leaving.
Step 5: Construction tools should be environmentally friendly.
Construction steps
Dust removal, construction closed transparent primer 8-12 hours after construction coated, medium coating 1-2 times, 24 hours later, spray wear-resistant cover glossy oil.
Stockpile
●Sealed in a cool and dry place at 5-40°C, shelf life for 18 months.
Special Notes:
1. The paint has strong adhesion and should cover the parts that do not need to be painted; Wash the tools immediately after construction.
2. The color paint will show a new color that is different from the color or different shade on the color card due to the construction surface material, it is recommended to take out the color paint, first do a small area and then make sure. After the correct color, do large-area construction.
3. Store in a place that is not easy for children to touch. Coating area:
Theoretical value (primer) 6-9/square meter/kg (topcoat) 8-10 square meters/kg, due to the different climate of the substrate material, the actual construction area will be different from the theoretical value.
上一頁(yè)
無(wú)
下一頁(yè)